Xstrata plc
Skip Navigation Links
Home
About
Mining
Environment
Approvals & Licenses
Biodiversity
Community
Sustainability
Publications
 
   
 

Bobadeen irrigation scheme 

Centre pivot irrigating
Bobadeen Dam Pumps

The Bobadeen Irrigation Scheme (BIS) was incorporated into the Ulan Mine Complex water management system in September 2003. The introduction was in response to a commitment by UCML to minimise untreated off-site water discharge.

The operation pumps its surplus mine water from the mine site to a 502 mega litre storage dam located seven kilometres north of the mining operations. Once it reaches the holding dam, the water is then pumped to five centre-pivot irrigators, which irrigate 242 hectares of land planted with vigorously growing perennial pastures.

The pasture is maintained at an optimal level by beef cattle, which graze the pastures under a carefully monitored rotational basis. Internal subdivision fencing has also been erected to manage the movement of cattle between the grazing areas.

UCML has developed a unique salinity offset programme to ensure there is no net increase in the salinity load in the Macquarie and Hunter River catchment areas.